Skip to Content

On the 16th July, Rolton Group staff paid a site visit to Winsey Farm to witness the erection of the company’s first ‘Rolton’ wind turbine.

The component parts are now all bolted in place, and the impressive structure, standing at 50 metres to hub and 64 metres to tip, will be fully commissioned within the next week to start harnessing the energy that blows around us as wind.

Having worked on the foundation designs for the tower, our engineers were keen to see the finished product, which will be fitted with a chip that transmits data so that its generation levels and status can be monitored off-site. Electricity from the turbine will be sold to a local pig farmer, allowing him to raise carbon neutral livestock, and surplus power will be connected to the National Grid. We’re also looking at options to sleeve the electricity supply through to our offices to further reduce our in-house carbon footprint.

Localised energy generation is an important part of a secure future for UK power supply, and we are proud to become part of a landscape that sees the vision of exiting Minister for the Department of Energy and Climate Change Greg Barker MP come true, in which the Big Six becomes the Big 60,000.

For photos from the site visit, please visit our album on Facebook.

News

Team photograph at Wind Turbine

Powering the 2035 industrial and data-driven revolution

12 March 2025

Our paper begins with a fundamental truth – that if we are to have the energy we need to ‘power the 2035 industrial and data-driven revolution’, we need to focus on delivering sustainable energy and infrastructure for the UK.

Rolton on the up with launch of new service line

28 February 2025

Rolton today announced the launch of a new service line focused on the design, construction, commissioning, handover and in-use support of advanced lift technology, championed by leading expert Tim Piggott.

Please submit your email address to unlock this download.