9.7m Project
90% Lower thermal energy
70% Lower gas & electricity

Built to Passivhaus standards, targeting low embodied carbon materials Buntingford First School opened its doors in September 2023 as the first net-zero carbon school in the UK, resulting in ultra-low energy buildings, promoting environmental sustainability.

Appointed by Morgan Sindall, and Hertfordshire County Council Rolton provided multi-disciplinary engineering services including civil, structural and building services (MEP) engineering.

The building is arranged over two storeys, comprising 10 classrooms (including a rooftop outdoor classroom), nursery and play areas for 330 pupils. With sustainability at its core, the project provided savings on operating costs and a reduction in carbon emissions featuring over 300 solar panels, 6 EV charging points, air source heat pumps and triple glazed windows.

Aligned with Hertfordshire County Council’s ambitions to be carbon neutral by 2030, the school was designed with carbon reduction in mind and built to Passivhaus Standards and has achieved Passivhaus Plus, meaning thermal energy consumption is typically 90% lower, and gas and electricity consumption typically 70% lower, than a standard new building, resulting in significant savings on operating costs and reduced carbon footprint.

During design stages, our engineers rationalised drainage, foundation designs and structural elements to help reduce embodied carbon. The number of piles in the foundation solution was reduced by around 20% and internal ground beam widths reduced where possible, resulting in less material required in construction.

  • Net zero carbon in both construction and operation – the first wholly NZC in England
  • Exceeded the embodied carbon target of 600kg of CO2 per square metre set by the Low Energy Transformation Initiative (LETI) – by 50%
  • Surpassing an airtightness target of 0.6 ach (0.25 ach)
  • The low carbon cross laminated timber (CLT) frame used provides durability while reducing the carbon footprint of the external structure by around 80% when compared against a more traditional concrete frame solution
  • The CLT frame significantly reduced the build sequence for the main structure down to approx. three weeks, instead of the six months typically expected with traditional build methods
  • The building features triple-glazed windows, air source heat pumps for heating and hot water, and over 300 solar panels which will power electric vehicle charging points. All teaching spaces face north, without south-facing windows that could cause rooms to over-heat, while the “social functions” of the school face south
  • Our civil engineers worked closely with Hertfordshire County Council to agree the drainage strategy and a plastic paving grid was used instead of concrete. Our structural engineers used concrete as sparingly as possible and avoided traditional floor slabs, instead using a pre-cast suspended hollow core plank system to reduce the volume of concrete used, resulting in further carbon savings.

Credit for photography: Hertfordshire County Council and Morgan Sindall.

News

Darcy Edwards joins Built Environment Futures Assembly as a Young Leader

5 October 2026

We are delighted to announce that Darcy Edwards, Executive Officer to the Chairman at Rolton, has joined BEFA as a Young Leader. The appointment builds on Peter Rolton’s position on BEFA’s Strategic Advisory Board, giving Rolton a unique opportunity to contribute at two critical levels: through established industry leadership and through the experience, priorities, and fresh ideas of the next generation.

Lift at the Open University

Rolton strengthens vertical transportation division with strategic appointment of senior consultant.

17 August 2026

We are delighted to welcome Krzysztof Mielnik to the Rolton team as senior consultant for vertical transportation (VT).

Krzysztof’s appointment marks the next step in the rapid growth of our recently launched independent Vertical Transportation consultancy. Led by industry expert Tim Piggott, our dedicated VT team provides comprehensive expertise across the entire lifecycle of advanced lift technology from design and construction to commissioning, handover, and ongoing operational support.

Rolton contributes to new 2030 built environment workforce planning report

10 June 2026

Rolton is pleased to have contributed to the newly launched industry report, ‘Built Environment Strategic Workforce Planning for 2030’.

The comprehensive publication stems from the latest INSPIRE event hosted by the Built Environment Futures Assembly (BEFA). This powerful leadership forum was established by the University of the Built Environment (UBE) to break down professional silos, spark collaboration, and drive excellence across engineering, construction, and real estate.