Following our successful work at the Royal Opera House in London, we were appointed by long-standing client Playfords to support the major alteration and refurbishment works at the prestigious Grade I listed, Theatre Royal.

The restoration saw the refurbishment of the Greek Revival front of house design, with new stage facilities, dressing rooms, bars and restaurants. This project is the largest programme of works recently undertaken at Theatre Royal and required the theatre to close for the first time in recent history.

  • Laser scan survey of existing building
  • Significant challenges with services routing within the confines of existing structure simplified via use of detailed 3D coordination
  • Collaboration with multiple specialists including factoring designs into 3D coordination
  • Full 3D coordination within Revit MEP
  • Building owned and operated by LW Theatres
  • Winner of ‘Theatre Building of the Year’ at The Stage Awards 2022.

We provided full MEP design coordination services in 3D for the refurbishment and alteration works, ensuring an efficient use of space for all building services within the confines of the existing structure as the project develops.

Working within an existing building of significant age posed several challenges when developing the mechanical and electrical services routing throughout. Using the detailed 3D coordination, many tight spaces were concept proven prior to installation, saving time and money during the build.

Credit for photography:

Philip Vile, and Andy Paradise at Paradise Photos.

News

Lift at the Open University

Rolton strengthens vertical transportation division with strategic appointment of senior consultant.

17 August 2026

We are delighted to welcome Krzysztof Mielnik to the Rolton team as senior consultant for vertical transportation (VT).

Krzysztof’s appointment marks the next step in the rapid growth of our recently launched independent Vertical Transportation consultancy. Led by industry expert Tim Piggott, our dedicated VT team provides comprehensive expertise across the entire lifecycle of advanced lift technology from design and construction to commissioning, handover, and ongoing operational support.

Rolton contributes to new 2030 built environment workforce planning report

10 June 2026

Rolton is pleased to have contributed to the newly launched industry report, ‘Built Environment Strategic Workforce Planning for 2030’.

The comprehensive publication stems from the latest INSPIRE event hosted by the Built Environment Futures Assembly (BEFA). This powerful leadership forum was established by the University of the Built Environment (UBE) to break down professional silos, spark collaboration, and drive excellence across engineering, construction, and real estate.